RRNC rough-ins from $400 per lot. Builders and supers: we work around your pour schedule, not the other way round.
Call Now (520) 423-5900Tell us what's going on with the house. We reply to most messages the same day.
Every retrofit we sell for $2,000+ could have been a few hundred dollars of pipe and gravel before the slab went down. Radon-resistant new construction is the rare building upgrade that is genuinely almost free at the right moment and annoyingly expensive at every moment after. If you're building in the north Valley granite belt, Cave Creek, Carefree, north Scottsdale, Anthem, Desert Hills, Rio Verde, the case stops being economic and starts being obvious: that's where Arizona's hot readings cluster.
Four components, per EPA radon-resistant new construction practice. A gas-permeable layer under the slab, typically four inches of clean aggregate, which your job likely has anyway. Perforated collection piping or a soil-gas mat tied into a tee below the slab. A sealed vertical riser, three or four inch PVC, run through an interior chase to a capped stub in the attic with a service outlet nearby. And sealing details at the big penetrations. Poured, framed, done: the house now has a passive radon system that often keeps levels down on stack effect alone.
Here's the part owners like. After move-in, a 48-hour test tells you whether the passive stack is enough. Under 4.0, most are, and you're finished; the system just sits in the walls as cheap insurance and a selling point. Over 4.0, activating it means wiring a fan into the attic stub we left, an hour of work, no core drilling, no exposed pipe, no scanner hunting post-tension cables through your finished floors. Compare that to what a retrofit involves on the mitigation page and the rough-in sells itself.
Single custom lots to small phases. We coordinate with your super and plumbing sub, show up between utility rough-in and vapor barrier, and are off the pad the same day. $400 to $850 per lot depending on slab size and whether we're supplying the aggregate spec or just the piping and riser. Plan sets get a one-page detail drawing your inspector can initial. And if you'd rather your own crews lay the pipe, we'll spec it and do the final connections and QA for less. Volume pricing on phases is a phone call.
Price a rough-in for your next pour: (520) 423-5900.